Bekasi Power
Power Plant
In order to augment power requirements from the industrial estate and surroundings, Jababeka embarked on a 130MW Power Plant, operated and managed by wholly owned subsidiary PT Bekasi Power. Jababeka has looked in the future and realized power demand will keep growing, which is why enough space for a second 130MW power plant is available.
The Power Plant consists of two state-of-the-art frame 6B gas turbines, manufactured by General Electric Energy with an installed capacity of 40 - 42 MW each by ISO rating. Furthermore, there are two heat recovery steam generators (HRSG) from Thermax Babcock and Wilcox Limited. The combined cycle is completed by a steam turbine from Shin Nippon with a capacity of 46 - 50 MW, which is driven by pressurized high temperature steam from both HRSGs that are fired by using the exhaust gasses from the gas turbines. The total installed capacity amounts to 130MW and is planning to double its capacity to 2 x 130MW in the coming years.
A Joint Operation Agreement between PLN and Bekasi Power allows Bekasi Power to not only enhance Kota Jababeka’s electricity and energy infrastructure by providing specialized services to industrial customers, but also directly support PLN’s mission to strengthen its electricity system, especially in the Bekasi and Karawang industrial areas.
With international standard equipment and redundant gas supply, Bekasi Power ensures an Uninterruptible Power Supply (UPS) at a competitive price that would help support Indonesia's national power grid and industrial growth for years to come.
Available Jobs For Bekasi Power
Sorry, there are currently no available job vacancies for this company. Please come back later.